Huaneng Power International, Inc. Power Generation within China Increases by 11.51% in the First Half of 2018
BEIJING,July 17,2018 --Huaneng Power International,Inc. ("HPI" or the "Company") (NYSE: HNP; HKEX: 902; SSE: 600011) today announced its power generation for the first half year of 2018.
According to the preliminary statistics of the Company,for the second quarter of 2018,the Company's total power generation by power plants within China on consolidated basis amounted to 103.856 billion kWh,representing an increase of 14.52% over the same period last year. Total electricity sold by the Company amounted to 98.075 billion kWh,representing an increase of 14.54% over the same period last year. In the first half of 2018,the Company's total power generation by the power plants within China on consolidated basis amounted to 208.167 billion kWh,representing an increase of 11.51% over the same period last year. Total electricity sold by the Company amounted to 196.387 billion kWh,representing an increase of 11.51% over the same period last year. In the first half of 2018,the Company's average on-grid electricity settlement price for its power plants within China amounted to RMB418.57 per MWh,representing an increase of 2.72% over the same period last year.
The increase in the Company's power generation was mainly attributable to the following reasons: (1) The growth in the macro-economy was better than expected; and (2) The growth rate of electricity consumption for residents' electricity,tertiary industries and non-high-energy-consuming manufacturing industries increased significantly; and (3) In the first half of the year,the growth rate of hydropower generation in the country was relatively low,far lower than the growth rate of the electricity consumption of the whole society and national power generation. The Company has a relatively higher proportion of thermal power units and seized the opportunity to increase power generation.
The power generation (in billion kWh) by each region of the Company's domestic power plants are listed below:
Region
Power Generation
Electricity sold
April to June 2018
Change
January to June 2018
Change
April to June 2018
Change
January to June 2018
Change
Heilongjiang Province
3.630
14.06%
6.930
8.01%
3.417
14.55%
6.503
8.12%
Coal-fired
3.343
16.61%
6.387
6.79%
3.130
17.06%
5.969
6.81%
Wind-power
0.275
-13.07%
0.528
21.05%
0.274
-11.22%
0.518
21.52%
PV
0.0127
–
0.0160
–
0.0080
–
0.0112
–
Jilin Province
2.778
40.13%
5.089
27.77%
2.643
40.81%
4.822
28.52%
Coal-fired
2.389
47.49%
4.403
28.89%
2.268
48.37%
4.161
29.57%
Wind-power
0.285
0.68%
0.519
21.92%
0.278
1.48%
0.506
23.28%
Hydro-power
0.039
3.06%
0.043
-4.59%
0.039
2.71%
0.042
-4.83%
PV
0.0064
2,259.26%
0.0122
4,391.16%
0.0063
2,284.19%
0.0121
4,465.92%
Biomass power
0.058
41.91%
0.112
16.68%
0.052
42.85%
0.101
17.97%
Liaoning Province
4.728
40.66%
9.320
8.74%
4.429
41.30%
8.654
8.00%
Coal-fired
4.550
40.54%
9.005
7.57%
4.253
41.19%
8.341
6.74%
Wind-power
0.119
16.83%
0.210
23.84%
0.118
16.91%
0.209
23.99%
Hydro-power
0.015
19.93%
0.023
64.36%
0.015
19.86%
0.022
63.74%
PV
0.0439
367.82%
0.0826
382.25%
0.0434
379.26%
0.0817
394.30%
Inner Mongolia
0.065
2.11%
0.128
14.20%
0.064
2.39%
0.126
14.12%
Wind-power
0.065
2.11%
0.128
14.20%
0.064
2.39%
0.126
14.12%
Hebei Province
3.611
-7.42%
6.439
-4.85%
3.388
-7.76%
6.050
-4.92%
Coal-fired
3.534
-7.69%
6.264
-5.66%
3.314
-8.06%
5.881
-6.01%
Wind-power
0.061
0.35%
0.144
35.66%
0.059
1.04%
0.140
61.16%
PV
0.0157
44.09%
0.0305
46.31%
0.0151
46.81%
0.0293
49.62%
Gansu Province
2.654
37.69%
6.503
27.26%
2.518
38.56%
6.178
27.56%
Coal-fired
2.163
42.28%
5.523
25.61%
2.044
43.15%
5.231
25.82%
Wind-power
0.491
20.57%
0.980
37.44%
0.475
21.72%
0.947
38.09%
Ningxia
0.0069
1,495.35%
0.0108
2,419.15%
0.0066
1,512.89%
0.0104
2,439.24%
PV
0.0069
1,439.24%
Beijing
1.755
83.22%
3.958
18.26%
1.702
82.07%
3.775
19.86%
Coal-fired
0.00
–
0.436
-59.88%
0.00
–
0.381
-59.63%
Combined Cycle
1.755
83.22%
3.522
55.79%
1.702
82.07%
3.393
53.93%
Tianjin
1.568
6.16%
3.595
10.81%
1.474
5.40%
3.368
10.44%
Coal-fired
1.311
23.69%
2.878
6.97%
1.224
23.41%
2.672
6.51%
Combined Cycle
0.256
-38.59%
0.716
29.14%
0.249
-38.71%
0.694
28.34%
PV
0.0009
800%
0.0016
11,187.59%
0.0009
–
0.0016
–
Shanxi Province
2.247
-20.96%
4.793
-11.37%
2.081
-22.00%
4.483
-12.03%
Coal-fired
2.227
5.30%
3.596
4.41%
2.061
5.20%
3.318
4.19%
Combined Cycle
0.001
-99.90%
1.161
-40.89%
0.001
-99.91%
1.128
-41.00%
PV
0.0189
5,300%
0.0368
10,315.31%
0.0191
–
0.0370
–
Shandong Province
21.724
2.42%
42.866
2.42%
20.380
2.27%
40.113
2.28%
Coal-fired
21.399
1.70%
42.258
1.73%
20.062
1.52%
39.539
1.60%
Wind-power
0.207
55.24%
0.416
61.62%
0.201
52.20%
0.383
53.15%
PV
0.1184
222.78%
0.1923
251.39%
0.1174
249.04%
0.1909
277.56%
Henan Province
6.763
38.31%
12.693
16.74%
6.380
38.21%
11.963
16.63%
Coal-fired
6.321
44.46%
12.138
23.06%
5.947
44.60%
11.418
23.19%
Combined Cycle
0.413
-16.28%
0.495
-48.91%
0.405
-16.18%
0.485
-48.85%
Wind-power
0.021
12.28%
0.046
21.35%
0.021
12.28%
0.046
21.49%
PV
0.0072
402.1%
0.0132
823.41%
0.0071
400.54%
0.0130
820.58%
Jiangsu Province
9.823
-14.58%
20.526
-4.02%
9.317
-14.69%
19.474
-4.03%
Coal-fired
7.703
-24.43%
16.678
-11.95%
7.241
-24.89%
15.705
-12.35%
Combined Cycle
1.712
55.94%
2.957
46.93%
1.679
55.97%
2.902
46.97%
Wind-power
0.388
96.83%
0.855
104.19%
0.378
96.62%
0.834
115.06%
PV
0.0207
72.5%
0.0347
189.32%
0.0191
62.67%
0.0329
180.86%
Shanghai
4.488
24.53%
10.001
14.09%
4.246
24.50%
9.472
13.95%
Coal-fired
4.024
26.42%
9.204
17.44%
3.791
26.42%
8.693
17.39%
Combined Cycle
0.465
10.29%
0.797
-14.16%
0.455
10.52%
0.780
-14.12%
Chongqing
1.683
8.27%
4.517
7.28%
1.540
7.57%
4.173
6.67%
Coal-fired
1.547
14.34%
4.127
18.54%
1.408
13.88%
3.793
18.45%
Combined Cycle
0.136
-32.55%
0.390
-46.53%
0.132
-32.41%
0.380
-46.51%
Zhejiang Province
8.257
14.93%
14.798
10.08%
7.945
15.08%
14.231
10.19%
Coal-fired
8.020
14.02%
14.439
9.35%
7.712
14.14%
13.878
9.43%
Combined Cycle
0.219
58.90%
0.330
52.51%
0.215
59.47%
0.324
53.10%
PV
0.0187
40.49%
0.0293
29.05%
0.0186
47.32%
0.0292
33.50%
Hubei Province
3.545
42.29%
8.064
23.46%
3.305
42.47%
7.534
23.29%
Coal-fired
3.329
44.91%
7.715
23.80%
3.111
46.07%
7.221
24.10%
Wind-power
0.103
29.89%
0.192
31.57%
0.083
6.25%
0.159
11.24%
Hydro-power
0.107
-7.24%
0.146
-4.96%
0.104
-6.83%
0.142
-4.31%
PV
0.0066
65,900%
0.0111
110,400%
0.0065
–
0.0110
–
Hunan Province
2.328
71.45%
5.526
41.41%
2.185
72.92%
5.191
42.05%
Coal-fired
2.061
86.75%
5.038
47.37%
1.922
89.75%
4.709
48.49%
Wind-power
0.160
17.62%
0.326
12.64%
0.159
17.49%
0.322
12.60%
Hydro-power
0.096
-17.26%
0.146
-26.38%
0.094
-17.32%
0.143
-26.44%
PV
0.0102
608.33%
0.0161
1,014.96%
0.0100
594.30%
0.0157
994.51%
Jiangxi Province
4.830
8.36%
10.043
11.74%
4.615
8.55%
9.609
11.86%
Coal-fired
4.737
7.31%
9.856
10.83%
4.524
7.29%
9.424
10.83%
Wind-power
0.093
115.45%
0.187
95.93%
0.091
163.61%
0.185
113.86%
Anhui Province
1.358
1.12%
2.806
-1.39%
1.296
1.13%
2.677
-1.76%
Coal-fired
1.249
-2.80%
2.620
-4.27%
1.188
-2.96%
2.497
-4.56%
Wind-power
0.073
188.72%
0.138
134.22%
0.073
189.11%
0.131
125.15%
Hydro-power
0.035
9.77%
0.048
-3.43%
0.035
9.90%
0.048
-3.42%
Fujian Province
3.049
39.70%
5.963
48.16%
2.880
40.11%
5.634
48.52%
Coal-fired
3.045
39.55%
5.957
48.01%
2.876
39.93%
5.628
48.36%
PV
0.0037
1,581.82%
0.0062
2,790.47%
0.0037
–
0.0062
–
Guangdong Province
7.683
46.87%
14.083
52.50%
7.361
47.36%
13.498
52.75%
Coal-fired
7.677
46.91%
14.072
52.55%
7.355
47.39%
13.487
52.80%
PV
0.0058
11.42%
0.0109
8.87%
0.058
11.50%
0.0109
8.97%
Guangxi
0.132
–
0.169
–
0.127
–
0.162
–
Combined Cycle
0.132
–
0.169
–
0.127
–
0.162
–
Yunnan Province
1.601
77.77%
2.573
36.80%
1.478
7.748%
2.376
36.32%
Coal-fired
1.461
82.53%
2.264
38.84%
1.343
82.41%
2.075
38.31%
Wind-power
0.139
39.55%
0.309
23.50%
0.135
39.94%
0.301
24.01%
Guizhou Province
0.052
268.42%
0.111
226.39%
0.051
270.26%
0.109
227.83%
Wind-power
0.052
268.42%
0.111
226.39%
0.051
270.26%
0.109
227.83%
Hainan Province
3.496
13.74%
6.661
16.02%
3.246
13.84%
6.202
16.24%
Coal-fired
3.423
14.73%
6.507
16.39%
3.175
14.90%
6.050
16.64%
Combined Cycle
0.008
317.96%
0.023
195.57%
0.007
316.26%
0.022
195.43%
Wind-power
0.017
-15.62%
0.046
-11.79%
0.016
-15.68%
0.045
-11.69%
Hydro-power
0.037
-41.55%
0.062
-22.42%
0.036
-41.69%
0.062
-22.48%
PV
0.0118
116.07%
0.0226
124.20%
0.0117
117.19%
0.0224
125.27%
Total
103.856
14.52%
208.167
11.51%
98.075
14.54%
196.387
11.51%
For the second quarter of 2018,the power generation of Tuas Power Limited in Singapore,which is wholly-owned by the Company,accounted for a market share of 21.1% in Singapore,representing a decrease of 0.7 percentage point compared to the same period of last year (21.8%). In the first half of 2018,the accumulated power generation accounted for a market share of 20.8%,representing a decrease of 0.7 percentage point compared to the same period last year.
In addition,the projects of the Company's wholly-owned Huaneng Heilongjiang Shuangyu Photovoltaic with a total capacity of 46.6 MW,30 MW PV units of the Huaneng Jiangsu Huaiyin Photovoltaic Power Plant and 10 MW PV units of the Huaneng Jiangsu Taicang Photovoltaic Ash Field Phase II (75% owned by the Company),8 MW PV units of Huaneng Hainan Chengmai Photovoltaic (91.8% owned by the Company),20 MW PV units of the Jilin ZhenLai Wind Farm (50% owned by the Company),and 10 MW PV units of the Shanxi Yushe Photovoltaic (90% owned by the Company) were put into operation in the second quarter of 2018. As of June 30,2018,the Company had a controlled installed capacity of 104,425 MW,and an equity-based installed capacity of 91,894 MW.
About Huaneng Power International,Inc.
Huaneng Power International,Inc. is one of China's largest listed power producers with controlled generation capacity of 104,425 MW and equity-based generation capacity of 91,894MW. The power plants of the Company are located in 26 provinces,autonomous regions and municipalities in China. The Company also has a wholly-owned power company in Singapore.
For enquiries,please contact:
Huaneng Power International,Inc.
Ms. MENG Jing / Ms. ZHAO Lin
Tel: (8610) 6608 6765 / 6322 6596
Fax: (8610) 6322 6888
Email: zqb@hpi.com.cn
Wonderful Sky Financial Group Limited
Ms. Crystal Hua / Ms. Christina Chong
Tel: (852) 3970 2155 / (852) 3641 1333
Fax: (852) 3102 0210
Email: po@wsfg.hk / crystalhuay@wsfg.hk
View original content:/news-releases/huaneng-power-international-inc-power-generation-within-china-increases-by-11-51-in-the-first-half-of-2018--300682194.html